Portfolio and lifecycle
Every site from diligence through development to operation, with Asset 360 for each.
Workbench connects facilities, sellable capacity, pipeline, contracts and finance, so every deal is checked against power you can actually deliver.
Halls sell out before they're energized, pre-leases run ahead of construction, and month-end means rebuilding the same numbers in four systems.
Every site from diligence through development to operation, with Asset 360 for each.
Capacity by hall, product and ready-for-service date, net of holds and pre-leases.
Every opportunity checked before anyone commits. Avery drafts the options.
Playbook review, approvals and obligations attached to the capacity they commit.
Customer load from PDUs, RPPs and busway against contracted kW, with unbilled usage flagged.
ARR, signed-not-started, capex and scenarios tied to halls and contracts.
Sample portfolio · FRA-01 Hall 3
Avery: Two options drafted. Phase 6.4 MW now and 1.6 MW after the upgrade, or move 8.0 MW to FRA-02 Hall 1.
Prepared work is subject to permissions and approval.Occupancy and WALT, contracted cash flow, power and ESG (PUE, WUE, renewables) and construction draw packages, each traced to source records.
From $60,000 a year including 10 MW. The rate per MW falls as you grow.
Book a demoEstimate your price